The Race

Policy tool · See record

Smooth approvals through ordinary planning

What the tool does

Use ordinary planning rules to assess a project openly, hear objections and issue a reasoned decision. Approval can be democratically contestable when the rules, evidence and review rights are visible; opposition is not the only sign of public control.

Current status

Ordinary planning and appeal processes are in use. The reviewed example demonstrates an approval path and subsequent challenge, not a finding that the project is harmless or that every planning process is adequate.

Where it has been used

Colorado Springs’ Project Taurus approval

Added by

Colorado Springs’ planning department issued administrative approval for Project Taurus. Residents subsequently used the City Council appeal process to challenge that approval. The administrative decision and the public appeal are different stages; the initial approval did not eliminate every route for public challenge.

Read more about this case →

Klickitat County’s draft rules

Added on

Rural Klickitat County, Washington, published a draft data-center ordinance for comment on September 22. An October 7 report describes a proposed threshold of 20 megawatts and a one-mile setback from homes. Commissioners are considering permanent siting rules while residents petition for a moratorium to prevent applications arriving before those rules are finished.

The county had not received site-permit applications or begun construction for the projects described in the report. Requests for electricity service show developer interest, not approvals or completed facilities. Under the current rules, review is largely a technical check of compliance; a 2023 policy allows data centers in industrial parks without the conditional-use hearing otherwise available through the county’s Board of Adjustment. The draft could reach the board around October 20, subject to legal review. Draft proposed review thresholds, not adopted participation rights.

Read more about this case →

Salem’s data-center prohibition

Added on

Reporting published October 12 says Salem, Massachusetts, councilors unanimously gave final approval on October 8 to a zoning amendment defining and prohibiting data centers. City staff considered them already impermissible under existing zoning, but the code lacked an explicit definition. This is a clarification of an existing prohibition, rather than evidence that Salem previously allowed the use.

The adopted language reportedly preserves servers that are accessory, incidental and subordinate to a lawful use in the same facility, such as a hospital’s server room. A separate business supplying hosting or data services to third parties does not receive that exception. Councilors also removed a proposed two-megawatt threshold and expect to revisit the definition. The certified adopted text remains necessary to confirm the amendment’s precise legal scope and commencement.

Read more about this case →

Hood County’s permit-appeal decision

Added on

On October 13, Hood County, Texas, rejected Sailfish Investors' proposed Comanche Circle settlement 3–1 and unanimously denied its appeal of on-site permit decisions. The proposed development is near Tolar and the Hood–Somervell county boundary, close to Dinosaur Valley State Park. KERA's reporting describes hours of public testimony and dispute over county development rules.

The rejected compromise would have reduced the proposed footprint from about 2,523 to 1,375 acres and added conditions involving setbacks, cooling, lighting and roads. Those concessions never became an executed agreement. The developer's threatened litigation is not a filed lawsuit or a permanent project cancellation. Project electricity capacity, power supply and water arrangements remain insufficiently established for a complete rural-project profile.

Read more about this case →

Riverside’s proposed policy alternatives

Added on

Riverside, California's Land Use Committee directed staff on October 13 to bring two data-center policy options to the council on November 10. One would establish a 45-day urgency moratorium, potentially extendable to a total of two years. The other would formalize staff's interpretation that data centers are already prohibited because they are not listed as a permitted use.

The city planner said Riverside had received no data-center applications. This is therefore preparation before applications arrive, not rejection of a named project. A separate city AI working group is developing recommendations, and the committee wants to prevent approvals while that work proceeds. The identifies the session; the available local account reports the committee's direction, not full-council adoption.

Read more about this case →

San Antonio requires council approval for future data centers

Added on

San Antonio’s council voted 9–2 on October 29 to require case-by-case specific-use authorization for future data centers. A developer must bring its proposal to elected representatives, giving residents a public decision point before construction. Council can consider project-specific conditions. The adopted approach confines the use to eligible commercial/industrial zones and excludes the Edwards Aquifer Recharge Zone.

The council rejected both a by-right alternative for certain industrial sites and the mayor’s more prescriptive package. Do not describe the rejected 1,000-foot setback or 45-day notice as adopted requirements. The indexed official meeting transcript identifies Option Two as the final motion, with definition and World Heritage amendments; independent local reporting confirms the completed vote. Final signed text, existing-project treatment and commencement remain documentary checks. independent corroboration.

Read more about this case →

Nye County’s adopted siting rules

Added on

Nye County, Nevada, adopted new regulations on October 8, reported October 14, with an October 28 effective date. They cover areas outside Hydrographic Basin 162, where the existing prohibition remains. Reporting describes a special-use permit requiring a public county hearing, a development agreement and studies of electricity, water, traffic, noise and public-service effects.

The reported final changes include a water-use cap and restrictions on evaporative cooling. A town board may provide a position, but its silence after 45 days does not veto the county application. The final ordinance needs comparison with the earlier draft and the pre-existing countywide pause; adoption is established more clearly than the exact final scope.

Read more about this case →

Newberry’s conditional approval rules

Added on

Newberry Township, Pennsylvania, adopted Ordinance 442 on October 13, according to October 14 reporting. Data centers would go through individual conditional-use approval in two industrial districts, allowing supervisors to assess whether a project meets the rules. The solicitor said no project application had yet been submitted.

The report describes water/noise studies, setbacks and security equal to 110% of estimated decommissioning costs before a building permit. That security would protect against an operator leaving closure costs behind; it is not a tax or a payment for operating impacts. The linked primary document is a review draft, so those detailed conditions need a final-text comparison. It is also necessary to establish whether the new ordinance restricts previously allowed development or enables a use previously not allowed.

Read more about this case →

Coweta County returns Project Peach’s site to rural-conservation zoning

Added on

On October 20, 2026, Coweta County, Georgia, approved returning approximately 323.9 acres for Project Peach from Light Industrial to Rural Conservation. The county’s official recap confirms the reversal. On April 15, 2025, commissioners had granted North Coweta Investors LLC industrial zoning for a data-center operation, subject to 25 conditions. Condition 21 required a land-disturbance permit by October 16, 2026. Condition 23 required a will-serve letter and power purchase agreement; CyrusOne obtained a twelve-month extension of the original October 2025 power-agreement deadline.

The county’s September 28 staff memo said the required permanent power agreement and permit were still missing. Reporting on the October 20 meeting says temporary construction power had been arranged and site plans had entered initial review, but the required permit and permanent supply agreement remained outstanding. Commissioners voted 3–2 to return the land to Rural Conservation. Some preparatory work occurred; the failure concerns the required final conditions. The action removes the project’s industrial zoning entitlement, not an operating data center. The final instrument and any subsequent challenge remain follow-up evidence.

Read more about this case →

Nassau County proposes excluding data centers from county incentives

Added on

Nassau County, Florida, released its data-center fact-finding committee’s initial report and draft regulations on October 21. The opens public review and schedules board workshops October 26 and November 9. The package proposes a regulated approval framework rather than a blanket permanent ban.

Its fiscal component is unusually concrete. Draft Section 17 would remove data centers from the county’s target-industry list and make them ineligible for its Economic Development Grant programme and county economic incentives. The also recommends evaluating benefits alongside public costs and requiring developers to bear infrastructure costs. These are proposed county conditions; they do not repeal state incentives or establish that the board has adopted the package.

Read more about this case →

Saginaw requires data-center impact review and continuing reports

Added on

The City of Saginaw’s certified Ordinance O-281 records an 8–0 vote September 28 and an October 9 effective date. Principal-use data centers require special-land-use review. A limited accessory-use exemption applies where computing serves the on-site enterprise, supplies no third parties, occupies at most 10% of the building footprint and is not in a separate building.

Covered developers must provide resource and operating information, hold neighborhood meetings and finance necessary public water/wastewater capacity increases. Continuing reports and noise studies are tied to business licensing; required reports must be submitted before renewal. The text also requires provision for decommissioning security. Certified ordinance.

Read more about this case →

Van Buren adopts siting, setback and noise rules before a project arrives

Added on

Van Buren, Arkansas, council members voted 6–0 on October 26 to adopt data-center regulations. The city confines facilities to Industrial-2 districts, requires 1,000 feet of separation from districts allowing residential development, and sets daytime/overnight noise limits of 65/55 decibels. Applicants must undergo development-plan review and supply utility-capacity information. These are restrictions on a permitted development route, not a citywide ban.

Mayor Joe Hurst says companies have made preliminary inquiries but submitted no formal project. Planning Director Wally Bailey drew on other Arkansas cities' ordinances. The available explanatory report establishes adoption and core requirements; the signed ordinance, measurement method, exceptions and commencement remain uninspected. The separate $45 million bond discussion in the headline is not established AI financing.

Read more about this case →

DeSoto blocks two expansion rezonings for the same proposed campus

Added on

DeSoto County, Florida, commissioners failed to approve DCIP-related rezoning applications on October 27 and 28: both motions tied 2–2. The first concerned 3-F Ranch; the second concerned the approximately 554-acre Swisher property. These were separate decisions within the developer's proposed campus near Arcadia. They leave the applications without the requested zoning. They do not reverse the separate March approval of the original 34.22-acre site. County application register.

The county register identifies the original application acreage for 3-F Ranch differently from the roughly 238 acres reported at the hearing; the final tract scope needs the decision record. Reporting describes a gas-powered campus proposal and unresolved noise, water and wastewater details. Neither the power capacity nor an operating cooling design was established. The developer's broader ambition is not operating capacity, and the failed votes do not establish permanent abandonment.

The county exercised existing land-use authority to withhold expansion permissions. For The Race, that is a concrete public decision rather than a protest count. The two applications should remain distinguishable without treating one proposed campus as two independent trend cases.

Read more about this case →

Jefferson County, Georgia, adopts a technology zoning district

Added on

Jefferson County commissioners adopted a technology zoning ordinance on October 28. WRDW reports that the county has no filed data-center applications. The administrator said no land is currently zoned for the new district, so a developer would need rezoning and multiple public meetings before proceeding. The county’s official notice confirms the scheduled text-amendment hearing, but does not itself prove adoption.

Residents questioned the protections and pace of the process. The final adopted ordinance and the former permitted-use rules have not been inspected together. The reporting establishes adoption and the administrator’s explanation of future review; it does not establish whether public decision rights increased.

Read more about this case →

Source snapshot: 2026-10-30. Individual event and verification dates remain as recorded above. Inclusion alone does not assign a score.