September strengthens governments' capacity to negotiate the terms of physical AI scale. Massachusetts's large-load permit framework, California's enacted data-center package and Prince William's special-use review establish different forms of leverage. Temporary restrictions in Oregon, Baltimore County and Centre Wellington preserve time to develop terms. They do not establish permanent exclusions or guarantee that later rules will be effective.
This builds on August's public cost-allocation mechanisms while leaving the concentrated ownership and financing of mega-projects in place. Prior federal-site commitments and dedicated-power projects continue to shape the starting position. Rural or behind-the-meter generation may loosen one grid bottleneck while increasing developer control of power and leaving public authorities with land, water, emissions and service burdens. Proposed capacity is not operating capacity, and a project announcement is not evidence that those burdens have been allocated fairly.
Public bargaining also has limits. North Dakota preserved the possibility of confidential negotiations. Frederick County rejected the draft Catellus agreement and extended its moratorium; the previously described benefits cannot be treated as an executed bargain. Loudoun's September 15 vote only advanced consideration of a future pause. The erroneous pause score was withdrawn without a reverse concentration score. Local wins matter in their own jurisdictions; they do not establish nationwide dispersion.
Other evidence. The rural and federal-site research records support the continuing concentration of infrastructure ownership and the distinction between grid-connected, dedicated-generation and proposed projects. Wayne County's September veto concerned fiscal terms, not project authorization; signed scope was unresolved at the cutoff. An October override must be treated in October. Australia's consultation creates a channel for public terms but not adopted requirements. Virginia's Wood Haven disclosure is early conduct evidence, with capacity and final transaction unresolved.
What would change this assessment. Protective terms surviving final permits and contracts; public access to energy, water and fiscal information; implemented ratepayer security; effective host-government bargaining; cancellations or binding limits that alter development rights; or evidence that private power architecture bypasses meaningful public review. Check Centre Wellington's signed exemptions and appeals, Maryland's operative text and the retained local source holds.
Further public-bargaining evidence. Brookwood's reported September 24 Applied Digital package combines large abatements and benefits for a proposed campus; the amounts are different streams and cannot establish net public value without their terms. Lea County's consideration of up to $134 billion of industrial revenue bonds is a financing ceiling, not a county cash expenditure or completed issuance. Proposed pauses in Grant, Mesa, Anne Arundel and Clackamas remain separate from adopted restrictions. FERC's September 29 PJM backstop proceeding preserves a review opportunity; it does not establish final protective cost allocation or procurement commencing that month.
Weld County's September permit and reported petition-circulation permission open a contest over an initial phase; neither proves blanket approval of a 1-GW expansion nor a certified referendum. Grady County reportedly declined one route to county planning authority September 28, without establishing project approval or loss of every other oversight option. Oregon's June-filed tax-exemption lawsuit, newly explained September 30, illustrates an existing judicial route to challenge fiscal terms rather than a new September court remedy. See the unscored evidence register for dates, retained dispositions and source links.